Tiler jobs in Batumi

Hiring is closed right now Leave your contact and experience — we will message you when new projects come up.

We are looking for tilers who follow the layout and get a bathroom accepted first time. We find the clients, you do the work.

Payment by stagesProjects in BatumiWork to drawings

What you will do

  • Laying tiles and porcelain in bathrooms, kitchens and on floors to the designer's layout
  • Large-format tiles 60×120 and up, 45° mitred edges
  • Forming falls to floor drains and linear shower channels
  • Grouting, including epoxy grout, and sealing junctions
  • Tiling over WC frames, boxing-in and niches to drawings

What we expect from you

  • At least 3 years of tiling and photos of 3 – 5 of your bathrooms
  • Your own tools are required: tile cutter, levelling system, levels, mixer
  • Able to read a tile layout and set out from the lines given in the project
  • Clean work: tidy joints, protected sanitaryware and adjacent surfaces

How the site inspector accepts the work

  • Lippage between adjacent tiles no more than 1 mm
  • Flatness within 2 mm under a 2 m straightedge, joints straight along their length
  • No voids: every tile is tapped, a hollow sound means it is relaid
  • Shower floor falls to the drain and water clears completely, checked with a flood test
  • Layout, cuts and joint positions match the drawing

Payment by stages

Finish a stage — we check it — we pay right away. No waiting for the whole project. Piece-rate pay; rates are discussed individually.

We pay only for accepted work. Rework is at your own expense. Your own tools are required; we buy the materials.

If you are used to working by eye, we are not a fit. If you take pride in your work, get in touch.

How we start working together

  1. 1

    Message on WhatsApp

    Trade, experience, area

  2. 2

    Photos of your work and a short call

    3 – 5 of your projects or a portfolio

  3. 3

    First project

    A normal paid job, small — a bathroom or one room. The inspector accepts every stage

  4. 4

    Contract

    We put the terms and payment schedule in writing

  5. 5

    Regular projects

    Payment by stages as the work is done

Other vacancies

All vacancies

FAQ

Who buys the tiles and adhesive?

The company purchases all materials and delivers them to site before the stage starts. You do not need to go shopping.

When is a bathroom paid?

Once technical supervision accepts the stage: tiles laid, grouted, inspection passed — the stage is paid. No waiting for the whole project to finish.

What if the inspector finds lippage?

The defect is fixed at your own expense, then the stage is accepted and paid. That is why we look for tilers who get it flat first time.

Need a tradesman, not a job? → Tiling

Join the reserve list

Send your trade, experience and area plus photos of 3 – 5 of your projects — we will keep your contact and message you when new projects come up.