Wall-hung toilet installation in Batumi
We fit concealed frames for toilets, bidets and basins, level them, pressure-test every joint and only then close the wall.
Wall-hung toilet installation — prices and estimate
Labour prices. Materials and equipment are on the estimate or yours. Enter quantities — the total updates instantly and goes to WhatsApp as a ready message.
When you need a concealed frame
- You want a wall-hung toilet instead of a floor-standing one
- You are renovating the bathroom and want to hide the cistern and pipes
- The concealed cistern keeps running into the bowl
- The flush plate sticks or works only every other time
- The wall-hung toilet wobbles or there is water underneath
- You need a bidet or basin on a concealed frame
What’s included
- Wall check — we decide how to fix the frame: to the wall, the floor or both
- Frame assembly — level and at a comfortable seat height
- Water supply — with a shut-off valve inside the frame, reachable through the flush plate
- Drain connection — correct slope and a sealed outlet
- Test before closing — flush and all joints checked under working pressure
- Toilet and flush plate — fitted after tiling, with a sound-insulating pad
- Photo report — the frame and pipes photographed before boarding
How we work
- 1
Visit and measuring
- 2
Frame installation
- 3
Test and photo report
- 4
Boarding and tiling
- 5
Fitting and start-up
Related jobs
More services: plumber
All pricesFAQ
How much does installation cost?
Installing a concealed frame with a wall-hung toilet starts from 250 ₾, cistern and flush repairs from 90 ₾. We give the exact price after the visit and before any work starts.
Will a wall-hung toilet hold an adult's weight?
Yes. The load is carried by a steel frame standing on the floor, not by the wall. If the wall is lightweight block or plasterboard, we add floor fixings and reinforce the base.
If the frame breaks, will you have to remove the tiles?
No. Valves and the flush mechanism are replaced through the opening behind the flush plate. That is why the access must stay open and the frame must be a decent one.
Can the toilet be moved to another spot?
Often yes, as long as the drain has enough slope: the further from the stack, the higher the outlet has to be. We will tell you on site whether it works in your flat.
I live abroad. Can it be done without me?
Yes. We agree the frame and price on WhatsApp or Telegram and send photos before the wall is closed plus a video of the flush test. Small jobs are paid after completion.
Concealed cistern frame and wall-hung toilet installation in Batumi
A wall-hung toilet frees up the floor, is easy to clean under, and the cistern is hidden in the wall. In a small new-build bathroom this adds noticeable space. But the reliability of such a setup depends entirely on what is hidden behind the tiles, which is why concealed frame installation in Batumi is broken down into steps, with every connection checked before the frame is boxed in.
Labour prices
- concealed frame with a wall-hung toilet, frame and flush plate: from 250 ₾;
- concealed frame for a bidet with a mixer tap: from 220 ₾;
- concealed installation of a basin on a frame: from 180 ₾;
- replacing a floor-standing toilet with a wall-hung one, including moving the waste pipe: from 120 ₾;
- repairing the flush mechanism and valves: from 90 ₾.
We will choose the frame, toilet and flush plate as part of the estimate, and if you have already bought them, we will install yours. We fix the total once the plumber has seen the wall and the stack.
Will it hold an adult
The load is carried not by the wall but by a steel frame with feet on the floor. It is fixed to the wall, the floor or both, depending on the material. In Batumi new builds, partitions are often made of lightweight blocks or plasterboard, and then the frame is additionally fixed to the floor and the base is reinforced. A correctly assembled concealed frame easily holds an adult's weight.
What happens behind the wall
We set the frame level and at a comfortable bowl height. We bring the water in with an isolation valve inside the frame, which can be reached through the opening under the flush plate. We run the waste with a fall and a sealed outlet. Then we test the flush and all the joints under working pressure, and only after that do we box the frame in with moisture-resistant plasterboard. The tiles are laid by our finishers or your own tradesman, and the toilet is hung on the finished cladding, over a sound-insulating gasket.
Will the tiles have to be broken if it fails
No. The valves and flush mechanism are replaced through the opening under the flush plate, so this opening must not be glued shut or tiled over. A cistern repair usually takes one visit.
Moving the toilet
A toilet can be moved to a new position if there is enough fall on the waste pipe. The further it is from the stack, the higher the outlet has to be, and sometimes this means a plinth or boxing. The real options can only be seen at an inspection.
Order of work
- We inspect the wall and the stack and choose the frame.
- We assemble and fix the frame and bring in the water and waste.
- We test the flush and photograph the connections before they are closed up.
- We box in the frame, after which the tiles are laid.
- We hang the toilet and flush plate and check again for leaks.
If you are not in Batumi, you will receive a photo report and a video of the flush test before the wall is closed up. 12-month guarantee.
Get a quote for your frame
Send a photo of the bathroom and the frame model — we will give you a price before work starts and pick a visit day.
