Flooring installer jobs in Batumi

Hiring is closed right now Leave your contact and experience — we will message you when new projects come up.

We need installers who check the subfloor first and then lay a floor with no gaps, squeaks or waves.

Payment by stagesProjects in BatumiWork to drawings

What you will do

  • Laying laminate and LVT, including glue-down
  • Glued parquet and engineered boards, herringbone where specified
  • Underlay, vapour barrier, transitions between floor finishes
  • Fitting skirting, including shadow-gap and paint-grade
  • Undercutting door frames and neat junctions with tiles

What we expect from you

  • At least 2 years of experience, photos of floors you have laid
  • Your own tools are required: mitre saw, jigsaw, level, moisture meter
  • Knowing manufacturers' requirements for subfloors and gaps
  • Laying to the project plan: direction, setting-out, thresholds

How the site inspector accepts the work

  • Subfloor within 2 mm over 2 m before laying, moisture within the manufacturer's limit
  • 8 – 10 mm expansion gap at walls for floating floors, covered by skirting
  • No gaps between boards, no squeaks or deflection underfoot
  • Direction and setting-out match the project, thresholds flush

Payment by stages

Finish a stage — we check it — we pay right away. No waiting for the whole project. Piece-rate pay; rates are discussed individually.

We pay only for accepted work. Rework is at your own expense. Your own tools are required; we buy the materials.

If you are used to working by eye, we are not a fit. If you take pride in your work, get in touch.

How we start working together

  1. 1

    Message on WhatsApp

    Trade, experience, area

  2. 2

    Photos of your work and a short call

    3 – 5 of your projects or a portfolio

  3. 3

    First project

    A normal paid job, small — a bathroom or one room. The inspector accepts every stage

  4. 4

    Contract

    We put the terms and payment schedule in writing

  5. 5

    Regular projects

    Payment by stages as the work is done

Other vacancies

All vacancies

FAQ

Who prepares the subfloor?

A separate tradesperson does the screed. You check it before laying, and if it is out of tolerance you tell the site manager rather than laying over it.

Do you supply the flooring?

Yes, the company buys the flooring and underlay and delivers them before the stage starts.

How is flooring paid?

Piece-rate, once the stage is accepted by technical supervision. Rates are discussed individually.

Need a tradesman, not a job? → Laminate and LVT flooring

Join the reserve list

Send your trade, experience and area plus photos of 3 – 5 of your projects — we will keep your contact and message you when new projects come up.