Drywall installer jobs in Batumi

Hiring is closed right now Leave your contact and experience — we will message you when new projects come up.

We need installers who build frames to the drawing and fit backing for everything that will hang on the wall.

Payment by stagesProjects in BatumiWork to drawings

What you will do

  • Plasterboard partitions with insulation as specified
  • Multi-level ceilings, curtain pockets and lighting coves
  • Boxing-in risers and ducts with access panels
  • Backing for TVs, kitchen units and WC frames
  • Wall linings on studs and dot-and-dab

What we expect from you

  • At least 2 years of experience, photos of ceilings and partitions
  • Your own tools are required: drill driver, laser level, snips
  • Able to read ceiling plans and sections
  • Coordinating with the electrician and plumber before boarding

How the site inspector accepts the work

  • Stud spacing per drawing, no more than 600 mm, fixings secure
  • Screws at board edges no more than 250 mm apart, heads set without tearing the paper
  • Flatness within 2 mm over 2 m, ceiling heights as per project
  • Backing and insulation photographed with a tape measure before boarding

Payment by stages

Finish a stage — we check it — we pay right away. No waiting for the whole project. Piece-rate pay; rates are discussed individually.

We pay only for accepted work. Rework is at your own expense. Your own tools are required; we buy the materials.

If you are used to working by eye, we are not a fit. If you take pride in your work, get in touch.

How we start working together

  1. 1

    Message on WhatsApp

    Trade, experience, area

  2. 2

    Photos of your work and a short call

    3 – 5 of your projects or a portfolio

  3. 3

    First project

    A normal paid job, small — a bathroom or one room. The inspector accepts every stage

  4. 4

    Contract

    We put the terms and payment schedule in writing

  5. 5

    Regular projects

    Payment by stages as the work is done

Other vacancies

All vacancies

FAQ

Who does the jointing after boarding?

Usually the painter. If you also do jointing, it is agreed separately and accepted as a separate stage.

Why photos of the backing?

So that a year later we know where a cabinet can be hung. Without photos with dimensions the stage is not closed.

When am I paid?

After the stage is accepted: frame and boarding checked by the inspector, then paid. Piece-rate, discussed individually.

Need a tradesman, not a job? → Drywall and partitions

Join the reserve list

Send your trade, experience and area plus photos of 3 – 5 of your projects — we will keep your contact and message you when new projects come up.