Renovation & Technicians in Calligraphy Towers
Calligraphy Towers is a Grand Maison complex of three towers on a shared podium (35, 45 and 40 floors) at 18 Shartava Street, opposite the stadium and about 450 m from the sea. The towers are handed over in stages: B in 2023, A in 2024, while C is still under construction. Apartments were sold as black or white frame — we do turnkey renovations at a fixed price and finish apartments bought renovated.
Heroes AlleyNeed a technician urgently
Apartment renovation in Calligraphy Towers
The building has black-frame, white-frame and finished apartments. We estimate from your condition: from scratch, from frame or a refresh.
About Calligraphy Towers
- Developer
- Grand Maison
- Location
- 18 J. Shartava St, opposite the stadium
- Towers
- Three on a shared podium: A — 35 floors, B — 45, C — 40
- Apartments
- 850
- Handover
- B — 2023, A — 2024, C under construction (planned for end of 2026)
- Tower A
- A hotel is planned up to the 20th floor, apartments above
- Handover condition
- Black or white frame; renovated and furnished units on resale
- Layouts
- From about 28 m²: studios, one- and two-bedrooms
- Ceiling height
- 2.8 m
- Frame and facade
- Monolithic, ventilated facade with blue glass, double-glazed PVC windows
- Heating
- Central
- Lifts
- Mitsubishi, including freight lifts
- Amenities
- Pools, spa, gym, cinema, co-working, restaurants, kids' centre, underground parking, smart-home system
- To the sea
- About 450 m
From the developer and open sources. Spotted a mistake? Let us know.
What to know about Calligraphy Towers
- Ceilings are 2.8 m: to keep the height, we make stretch or plasterboard ceilings on a single level and use surface or track lighting
- The building advertises a smart-home system: before renovating we check what is already installed and connect lighting, curtains and climate to it instead of adding a second system
- Heating is central: risers and meters stay accessible, and radiators are moved only with the management's permission
- Tower C is still under construction: if your apartment is there, we prepare the estimate and design from the layout so work starts right after handover
- The towers have freight lifts: we bring materials up on the management's schedule, protect the lobby and lift car and remove rubbish ourselves
- Units start at about 28 m²: in studios we use a single-wall kitchen, floor-to-ceiling wardrobes and sliding doors
- A hotel is planned below the apartments in tower A, and many buyers here rent out: we build in hard-wearing finishes, a smart lock and rental-ready furniture
- The facade is glass and the sea is about 450 m away: bathrooms get waterproofing under tiles and an extractor fan with a non-return valve, windows get curtains on a ceiling track
How we work in your building
You message — we clarify
Block, floor, apartment and what happened. Photos or a video help — the technician brings the right parts first time.
We arrange it with the building
Access, reception, the freight lift and noisy-work hours — we arrange it ourselves, you don't need to go anywhere.
We leave it clean
We protect the floor, lift and hall and take the waste away. Afterwards — photos of the result.
If you are not in Batumi
We collect the key from reception or your manager and send photos and video before and after. Payment after you accept the work.
More buildings: Heroes Alley and the new stadium
All buildingsMore buildings in Batumi
All buildings by areaFAQ
What condition are apartments in across the Calligraphy towers?
Towers B and A are handed over; units were sold as black or white frame, and resale units are sometimes renovated and furnished. Tower C is still being built. At the survey we tell you which stage your apartment starts from and send an estimate within 2 days.
How much does a studio renovation in Calligraphy Towers cost?
For a studio of about 30 m², white-frame work starts at 19,500 ₾ without furniture, at 650 ₾ per metre. Black frame adds rough work, and a turnkey option with furniture and appliances is priced from 1,560 ₾ per metre.
My apartment is in tower C — when should I start preparing?
Now: from the layout in your Grand Maison contract we price the work and draw the design, and book the crew for the week the tower is handed over.
How long will the renovation take?
A one-bedroom from white frame takes about 3 weeks, a two-bedroom about five; for black frame add 2 – 3 weeks for partitions, plaster and screed. The kitchen and wardrobes are made alongside the finishing.
How fast can you get to Calligraphy Towers?
From our base — about 5 min. From 9:00 to 20:00 we arrive within an hour. Urgent night call-out from 20:00 to 6:00: +500 ₾ per call.
What hours do the technicians work?
Technicians and renovation — daily from 9:00 to 20:00. We reply to messages from 9:00 to midnight. Urgent calls 24/7.
Need a technician in Calligraphy Towers?
Send the block, floor and what happened — we'll reply with the price and arrival time.
