White frame apartment renovation in Batumi
We take your apartment from the developer and hand it over ready to live in or rent out. Estimate in 2 days, deadline in the contract.
BatumiWhite, black or green frame
White frame. The most common option in Batumi new builds. Engineering and finishing can start right away.
- What’s already there
- Screed, plaster, windows
- What we do
- from 650 ₾ / m²≈ $250 / m²
Black frame. Bare concrete: everything is done from scratch, but the layout can be changed freely.
- What’s already there
- Concrete and windows
- What we do
- from 910 ₾ / m²≈ $350 / m²
Green frame. The developer has done almost everything. Final finishes, doors and plumbing fixtures remain.
- What’s already there
- Everything except final finishes
- What we do
- from 390 ₾ / m²≈ $150 / m²
What white frame renovation includes
- Checking the developer’s work — wall evenness, screed, utilities
- Electrical and plumbing — to the plan
- Waterproofing and mold protection — for the humid climate
- Tiles, floors, painting, ceilings — final finishes
- Doors, plumbing fixtures, lighting — installation
Stages and timeline
Measurement and estimate
Partitions and engineering
Rough finishing
Final finishing
Handover
New build projects
All projectsКвартира 2+1 под ключ с мебелью
Квартира 2+1 под ключ: дизайн-проект, отделка, кухня на заказ, мебель и техника — можно сразу жить.
- Area
- 92 m²
- Timeline
- 115 days
- Budget
- 151 000 ₾≈ $58 000
Квартира для владельца из-за границы, удалённо
Квартира в зелёном каркасе, весь ремонт — без приезда владельца: договор онлайн, отчёты каждую неделю.
- Area
- 48 m²
- Timeline
- 37 days
- Budget
- 20 600 ₾≈ $7 900
Ванная под ключ
Ванная во вторичке: демонтаж, новые трубы, гидроизоляция, плитка, инсталляция и душевая без поддона.
- Area
- 6 m²
- Timeline
- 21 days
- Budget
- 12 200 ₾≈ $4 700
White frame FAQ
What is a white frame apartment in Batumi?
The condition the developer hands over: plastered walls, screed, windows and utilities brought in. What remains is engineering to your layout and all the finishing.
Can we start before the building is completed?
Yes: we prepare the design project and estimate in advance and start work the day you get the keys.
Is renovation for rental different?
We choose hard-wearing materials and fit out furniture and appliances so the apartment can be rented out right away.
